Gas pipe sizing & purge

AS/NZS 5601.1:2022 Appendix F method and Appendix D purging · Cl 6.4.6 ventilation · Copper AS 1432 Type B

Supply

Pipe sections

Work back from the furthest appliance. Enter the total load each section carries (everything downstream of it).

Convert kW to MJ/h

MJ/h = kW × 3.6 (Clause F.3.1(a)).

Results

SectionLoad MJ/hMin sizeCapacity MJ/hVelocity m/sCheck

Capacity of each size at this length

SizeBore mmCapacity MJ/hm³/h
How this is worked out

Longest-length method (F.3): every section is sized using the full longest run length and the full allowable pressure drop.

Flow is calculated the way Appendix F says its tables were made (F.1.2–F.1.5): isothermal compressible flow with Churchill's friction factor, a 50% length allowance for fittings, smooth copper at minimum bore, and the standard's gas properties (natural gas: 38 MJ/m³, relative density 0.6; propane: 96 MJ/m³, relative density 1.5).

Spot-checked against the copper tables for both gases: results land within about 1–2 MJ/h of the printed figures.

Velocity shading: the tables grey out sizes with excessive velocity (F.1.6), and short runs under 100 diameters long need a performance-based design (F.1.7). The standard doesn't print a velocity number, so this tool flags anything over 20 m/s as a rough warning only. For a compliance job, confirm the chosen size against the matching Appendix F table.

Calculated tool for checking your work. Confirm final sizes and procedures against AS/NZS 5601.1 and your network operator's requirements.